分享
 
 
 

RFC131 - Response to RFC116: May NWG meeting

王朝other·作者佚名  2008-05-31
窄屏简体版  字體: |||超大  

Network Working Group E. Harslem - Rand

Request For Comments: 131 J. Heafner - Rand

April 1971

Response to RFC#116 (May NWG Meeting)

Phase One

Software Status of 360/65

1) Our software is currently being changed to reflect the new NCP

protocol delineated in RFC#107. These changes will be completed

before the end of May.

2) We are implementing a logger that, after an automatic ICP

dialog, can be driven from a local console. Any desirable messages

can be sent or received in EBCDIC, ASCII (8), or as binary streams.

The purpose of the logger is to allow sites to checkout remote log in

procedures. Since no prodUCtion-oriented services will be offered on

the 360/65, the logger is for eXPerimental purposes only. It will be

completed before the end of May.

3) We have not planned a TELNET. We will, however, implement both

server and user TELNETs once a specification is generally accepted.

Implementation time will be on the order of two weeks.

Transition from 360/65 to PDP-10

1) We plan to move from our 360/65 to a PDP-10. Rand will offer

Network services on the PDP-10. The hardware and software status of

the PDP-10 will be reported later.

2) The 360/65 Network connection will remain for some time due to

its production use by another ARPA-sponsored project at Rand.

Maintenance of the 360/65 Network software will be provided for the

lifetime of the connection but no new programs will be developed on

the 360/65 after September.

1) The UCSB/Rand Network activities were recently reported in RFC

#113 and earlier in RFC#78. The Climate Dynamics Project (CDP) at

Rand will continue to use this facility (more heavily) in the future.

2) In conjunction with the above facility, the Rand Network team

has planned and implemented a front-end graphics program to allow the

reduced data from UCSB to be displayed and interacted with locally as

graphs, contours, plots, and lists. This will be used in about three

months after an intermediate program, being written by the CDP

personnel, is completed.

Phase Two

Experimental Data Reconfiguration Service (Form Machine)

1) A working session was held recently at Rand on the Data

reconfiguration Service (DRS), the results of which have been drafted

and are being edited by the participants. These data will be

published soon as an RFC. Eric Harslem will be prepared to make an

oral report at the NWG meeting on the DRS.

Protocol Manager

1) We plan to submit a positional paper on a proposed Protocol

Manager, which will allow flexibility in both experimental and

production use of connection protocols. This will be presented as a

Request for Comments on a software package that Rand intends to

implement for its use on the PDP-10. For example, it should obviate a

fixed logger on our forthcoming PDP-10.

1) We have been proponents of the collective NWG as a forum to

raise issues and as a general information transfer mechanism of what

sites are doing and thinking. More recently small working groups and

committees have been formed to generate particular specifications such

as TELNET, the new NCP protocol, etc. We favor continuance of these

methods as long as any site with a willingness, an interest, and

contribution is not excluded from any group or committee. We feel

that these groups will limit themselves to a small functional size a

priori because they are directed toward special interests.

The long lead time between the formation of such a group and

their final output (and subsequent implementation of the plan) has

been accepted by the NWG Technical Chairman and is rather

disconcerting. The NCP glitch cleaning committee is an example of

expedient work. UTAH, for example, has already implemented the new NCP

protocol. Other groups (including the DRS) have not been as

responsive. Perhaps the technical problems addressed by other groups

are more complex and the needs for their solutions are not as

immediate as the NCP glitches. We offer no nice solution except that

perhaps some guidelines should be established concerning timely

publication of reports.

2) Regarding long range goals of the NWG, we do not think that

the NWG is the right body to establish the long range goals. By long

range goals of the NWG, we are really concerned (in part) with long

range goals of the Network. We feel that the Principal Investigators

are in a position to have a better perspective of long range Network

goals than the NWG members. As a suggestion, one way of converting

their views into NWG tasks is to have the NWG Technical Chairman host

a one day opinion session of the Principal Investigators, then report

these views to the NWG for the generation of their implied tasks.

[ This RFCwas put into machine readable form for entry ]

[ into the online RFCarchives by Jim Thompson 4/97 ]

 
 
 
免责声明:本文为网络用户发布,其观点仅代表作者个人观点,与本站无关,本站仅提供信息存储服务。文中陈述内容未经本站证实,其真实性、完整性、及时性本站不作任何保证或承诺,请读者仅作参考,并请自行核实相关内容。
2023年上半年GDP全球前十五强
 百态   2023-10-24
美众议院议长启动对拜登的弹劾调查
 百态   2023-09-13
上海、济南、武汉等多地出现不明坠落物
 探索   2023-09-06
印度或要将国名改为“巴拉特”
 百态   2023-09-06
男子为女友送行,买票不登机被捕
 百态   2023-08-20
手机地震预警功能怎么开?
 干货   2023-08-06
女子4年卖2套房花700多万做美容:不但没变美脸,面部还出现变形
 百态   2023-08-04
住户一楼被水淹 还冲来8头猪
 百态   2023-07-31
女子体内爬出大量瓜子状活虫
 百态   2023-07-25
地球连续35年收到神秘规律性信号,网友:不要回答!
 探索   2023-07-21
全球镓价格本周大涨27%
 探索   2023-07-09
钱都流向了那些不缺钱的人,苦都留给了能吃苦的人
 探索   2023-07-02
倩女手游刀客魅者强控制(强混乱强眩晕强睡眠)和对应控制抗性的关系
 百态   2020-08-20
美国5月9日最新疫情:美国确诊人数突破131万
 百态   2020-05-09
荷兰政府宣布将集体辞职
 干货   2020-04-30
倩女幽魂手游师徒任务情义春秋猜成语答案逍遥观:鹏程万里
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案神机营:射石饮羽
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案昆仑山:拔刀相助
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案天工阁:鬼斧神工
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案丝路古道:单枪匹马
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案镇郊荒野:与虎谋皮
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案镇郊荒野:李代桃僵
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案镇郊荒野:指鹿为马
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案金陵:小鸟依人
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案金陵:千金买邻
 干货   2019-11-12
 
推荐阅读
 
 
 
>>返回首頁<<
 
靜靜地坐在廢墟上,四周的荒凉一望無際,忽然覺得,淒涼也很美
© 2005- 王朝網路 版權所有