分享
 
 
 

DL/T 5199-2004水电水利混凝土防渗墙施工规范(英文版)(Specification of Concrete Cut-off Wall Used for Hydropower and Water Conservancy Project)

DL/T 5199-2004水电水利混凝土防渗墙施工规范(英文版)(Specification of Concrete Cut-off Wall Used for Hydropower and Water Conservancy Project)  点此进入淘宝搜索页搜索
  特别声明:本站仅为商品信息简介,并不出售商品,您可点击文中链接进入淘宝网搜索页搜索该商品,有任何问题请与具体淘宝商家联系。
  參考價格: 点此进入淘宝搜索页搜索
  分類: 图书,英语与其他外语,英语读物,英文版,科普,
  品牌: 中华人民共和国国家发展和改革委员会

基本信息·出版社:中国电力出版社

·页码:58 页

·出版日期:2009年09月

·ISBN:9787508392011

·条形码:9787508392011

·包装版本:第1版

·装帧:平装

·开本:32

·正文语种:英语

·外文书名:Specification of Concrete Cut-off Wall Used for Hydropower and Water Conservancy Project

产品信息有问题吗?请帮我们更新产品信息。

内容简介《DL/T 5199-2004水电水利混凝土防渗墙施工规范(英文版)》内容简介:This Standard is compiled according to the document issued byformer Ministry of Electricity Industry, referred to as ZKJ[1998] 28,named as "Notice on the Plan of Stipulating and Revising Standardsand Specifications of Electricity Industry in 1997 ".

The application of concrete cut-off wall in hydropower andwater resources industry has been started since the end of 1950s inChina, which has a history of more than 40 years. During itsapplication, three industrial specifications has been stipulated byhydropower and water conservancy industry and issued respectivelyin 1963, 1979 and 1996. These three specifications immediatelyconcluded the achievements made during the development ofconcrete cut-off wall technique, and had played an important role inguiding the construction of concrete cut-off wall in our nation'shydropower development, promoting the application of newtechnique, new material and new technologies, and guaranteeing thequality of project.

A tremendous progress has been made in recent years in ournation's cut-off wall technique. Many new experiences had beenaccumulated, especially in our nation's key project such as ThreeGorges Project, Xiaolangdi Project, etc.. This Standard is compliedby summarizing the new technique in our nation's cut-off wallconstruction practice and also combining the experiences fromoverseas projects.

编辑推荐《DL/T 5199-2004水电水利混凝土防渗墙施工规范(英文版)》由中国电力出版社出版。

目录

Foreword

1 Scope

2 Normative References

3 Terms and Definitions

4 General

5 Working Platform and Guide-walls

6 Slurry

7 Trench Excavation

8 Materials and Construction of Cut-off Wall

9 Connection between Panels

10 Reinforcement Cage and Embedded Part

11 Treatment for Special Circumstances

12 Quality Inspection and Construction Records

Appendix A (Normative Appendix) Criteria for Evaluating theProl. rtional Compressive Strength and Homogeneity

Of ClaY Concrete and Plttstic Concrete

Appendix B (Informative Appendix) Forms of Figure and Table for

Construction Record

……[看更多目录]

文摘插图:

DL/T 5199-2004水电水利混凝土防渗墙施工规范(英文版)(Specification of Concrete Cut-off Wall Used for Hydropower and Water Conservancy Project)

7.0.1The axis and top elevation of the cut-off wall shall becontrolled by survey benchmarks according to design requirements.

7.0.9Determination of the trench length shall consider the factors,such as the engineering geological and hydrogeological conditions,construction location, trenching method, capability of equipment,duration of trenching, the supply of wall material, preformed holes inthe wall, the layout of tremie pipes and the plan shape of the wall.

The short trench may be adopted for closure trench, andarranged at location where the depth is relatively shallow and theconditions are relatively good.

7.0.3Trenches may be constructed by stages and enough safetyspacing shall be maintained between contiguous trenches that areconstructed simultaneously.7.0.4Trenching equipment and method can be selected accordingto the strata, the structural type of wall and the capability ofequipment, a combination of different equipment can be adoptedwhen necessary. The trenching methods are as follows: trenching byconcussion and split, trenching by drilling and grabbing, trenching bygrabbing, trenching by cutting, etc.

 
 
免责声明:本文为网络用户发布,其观点仅代表作者个人观点,与本站无关,本站仅提供信息存储服务。文中陈述内容未经本站证实,其真实性、完整性、及时性本站不作任何保证或承诺,请读者仅作参考,并请自行核实相关内容。
2023年上半年GDP全球前十五强
 百态   2023-10-24
美众议院议长启动对拜登的弹劾调查
 百态   2023-09-13
上海、济南、武汉等多地出现不明坠落物
 探索   2023-09-06
印度或要将国名改为“巴拉特”
 百态   2023-09-06
男子为女友送行,买票不登机被捕
 百态   2023-08-20
手机地震预警功能怎么开?
 干货   2023-08-06
女子4年卖2套房花700多万做美容:不但没变美脸,面部还出现变形
 百态   2023-08-04
住户一楼被水淹 还冲来8头猪
 百态   2023-07-31
女子体内爬出大量瓜子状活虫
 百态   2023-07-25
地球连续35年收到神秘规律性信号,网友:不要回答!
 探索   2023-07-21
全球镓价格本周大涨27%
 探索   2023-07-09
钱都流向了那些不缺钱的人,苦都留给了能吃苦的人
 探索   2023-07-02
倩女手游刀客魅者强控制(强混乱强眩晕强睡眠)和对应控制抗性的关系
 百态   2020-08-20
美国5月9日最新疫情:美国确诊人数突破131万
 百态   2020-05-09
荷兰政府宣布将集体辞职
 干货   2020-04-30
倩女幽魂手游师徒任务情义春秋猜成语答案逍遥观:鹏程万里
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案神机营:射石饮羽
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案昆仑山:拔刀相助
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案天工阁:鬼斧神工
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案丝路古道:单枪匹马
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案镇郊荒野:与虎谋皮
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案镇郊荒野:李代桃僵
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案镇郊荒野:指鹿为马
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案金陵:小鸟依人
 干货   2019-11-12
倩女幽魂手游师徒任务情义春秋猜成语答案金陵:千金买邻
 干货   2019-11-12
 
推荐阅读
 
 
>>返回首頁<<
 
 
靜靜地坐在廢墟上,四周的荒凉一望無際,忽然覺得,淒涼也很美
© 2005- 王朝網路 版權所有