DL/T5113.11-2005灯泡贯流式水轮发电机组安装工程(英文版)
分類: 图书,英语与其他外语,英语读物,英文版,科普,
品牌: 中华人民共和国国家发展和改革委员会
基本信息·出版社:中国电力出版社
·页码:32 页
·出版日期:2009年09月
·ISBN:9787508391342
·条形码:9787508391342
·包装版本:第1版
·装帧:平装
·开本:32
·正文语种:中文
产品信息有问题吗?请帮我们更新产品信息。
内容简介《DL/T 5113.11-2005 水电水利基本建设工程单元工程质量等级评定标准 第11部分:灯泡贯流式水轮发电机组安装工程(英文版)》内容简介:Part 11 of Quality Rating Criteria for Unit Works of Water Resources and Hydropower Project: Installation Works of Bulb Tubular Turbine Generator Unit (hereinafter as "this Standard") is prepared in accordance with the requirement of "Notice on Printing the Development and Revision Plan of Professional Standards in 2005 (Document 739, 2005) issued by the National Development and Reform Commission of the People's Republic of China.
编辑推荐《DL/T 5113.11-2005 水电水利基本建设工程单元工程质量等级评定标准 第11部分:灯泡贯流式水轮发电机组安装工程(英文版)》是由中国电力出版社出版的。
目录
Foreword
1 Scope
2 Normative References
3 General Principles
4 General Provisions
5 Installation of Turbine
6 Installation Work of Generator
7 Installation Work of Auxiliaries of Turbine-generator Unit
8 Commissioning of Hydraulic Turbine Generator Unit
Appendix A(Informative Appendix) Tables for Quality Rating of Unit Work and Sub-work
……[看更多目录]
序言Part 11 of Quality Rating Criteria for Unit Works of Water Resources and Hydropower Project: Installation Works of Bulb Tubular Turbine Generator Unit (hereinafter as "this Standard") is prepared in accordance with the requirement of "Notice on Printing the Development and Revision Plan of Professional Standards in 2005 (Document 739, 2005) issued by the National Development and Reform Commission of the People's Republic of China.
This Standard is formulated on the basis of Chapters 2 and 7 concerning the installation of bulb tubular turbine generator unit specified in SDJ249.3——1988 Installation Works of Hydro turbine-generator Unit of Quality Rating Criteria for Unit Works of Water Resources and Hydropower Project: (hereinafter as"he original standard") jointly issued by the former Ministry of Energy and Ministry of Water Resources, at the meantime adopted the progress of the technology of bulb tubular turbine generator unit at home and abroad in recent years and in accordance with the technical requirements of GB/T 8564—— 2003 Specifications for the Installation of Hydraulic Turbine Generator Units.
文摘插图:
5.1.1 Take the installation of one turbine as a combined unit work and the installation of one main part as a unit work. Check and rate the quality of each main part and then rate the installation quality of each turbine based on the quality grade of each main part.
5.1.2 The parts to be matched with each other shall be preassembled or be qualified with dimension fitting before being hoisted and assembled.
5.2 Check items and rating criteria
5.2.1 Installation quality of draft tube liner shall be rated in accordance with Table 5.2.1.
5.2.2 Installation quality of tubular seat and hatch cover shall be rated in accordance with Table 5.2.2.
5.2.3 Installation quality of distributor shall be rated in accordance with Table 5.2.3.
5.2.4 Assembly quality of runner shall be rated in accordance with Table 5.2.4.
5.2.5 Installation quality of main guide bearing shall be rated in accordance with Table 5,2.5.
5.2.6 Installation quality of rotating parts shall be rated in accordance with Table 5.2.6.
5.2.7 Installation quality of servomotor shall be rated in accordance with Table 5.2.7.